![]() Grounding Reliable protective grounding must be provided. Flexible copper is preferred.ĭepending on the situation and cable type, the cables must be embedded in the ground with proper cable duct. The height of the charger should be in above 4 ft from the ground.Ĭharger Dimensions (L x D x H): 21’’ x 12’’ x 27’’ || 24’’ x 12’’ x 27’’ Mounting Wall Mount Cables Input Cables must be Copper (3P+N+PE). The input cable provision is provided from the bottom the charger. SPECIFICATIONS Product # TP5-30-480 Input 480VAC (3P+N+PE), 60Hz FLA || Breaker 40A || 63A Output Voltage 150 to 1000VDC Output Current 0 to 100A Connector(s) CCS1ĭual CCS1 Efficiency ≥94% at nominal output power Power Factor > 0.98 Operating Temperature 22☏ to 131☏ (-30☌ to 55☌) Working || Storage humidity ≤ 95% RH || ≤ 99% RH (Non-condensing) Altitude < 6600ft (2000m) Display 7’’ LCD with touch screen RFID System ISO || IEC 14443A/B Dimensions (l x d x h) 21’’ x 12’’ x 27’’Ģ5’’ x 12’’ x 27’’ (Dual) Protective Class NEMA 3S, IK 10 Cooling System Air cooled Weight 176 lbs (80kg)Ģ20 lbs(100kg) – Dual Charging Protocol Mode 4, IEC-61851, ISO-15118, DIN SPEC 70121 Length of charging cable 16ft (5m) Interface protocol OCPP 1.6J Communication Ethernet / 4G Wi-Fi Electrical Safety: GFCI RCD 20 mA Type A (UL) Electrical Safety: Surge Protection 20 kA Electrical Safety General Over Voltage, Under Voltage, Over Current, Missing Ground Electrical Safety: Output Short Output power disabled when output is short circuited Electrical Safety Temperature Temperature Sensors Charge Coupler and Power Electronics Emergency Stop Emergency Stop Button Disables Output Power Regulatory Compliance UL-2202 || EMC: EN 6:2007, EN 61000-6- 3:2007/A1:2011/AC:2012 INSTALLATION OVERVIEW Electrical Input Requirements Input voltage: 480 VAC (3 Phase + Neutral + Earth), 60Hz Full Load Amperage: 40 Amps (At Rated power) Breaker Capacity: 63 Amps Location The charger can be installed on any stable wall or any pole structure with appropriate brackets. This manual covers the electrical and mechanical installation procedure for the Tellus TP-EVPD-30kW charger. ![]() Always test with a voltmeter before any maintenance or service is performed. There are components and circuits that remain charged for some time (1 to 2 minutes) with high voltage power, even after main power is disconnected. ![]() There are high voltage and high-capacity energy storage components on this system. Only trained personnel should be working in this equipment while the doors are open, and the unit is powered on. *For information about the ADA, including the revised 2010 ADA regulations, please visit the Department’s website or, for answers to specific questions, call the toll-free ADA Information Line at 800- 514-0301 (Voice) or 80 (TTY).ĭo not have power on while any of the maintenance doors are open unless proper personnel protection equipment is worn. Parking space, allowances for wheelchair movement, charger, bollards, and parking stops are defined in several publicly available EV charger installation recommended practices documents incorporating the ADA requirements. This equipment has been designed to meet ADA requirements when installed as prescribed in this manual and in accordance to the STANDARDS FOR ACCESSIBLE DESIGN for Americans with Disabilities document, 2010 ADA Standards for Accessible Design: This charging system contains both AC and DC high voltage circuitry and devices and should only be installed by a qualified electrician trained to work on high voltage, high current AC and DC systems. All grounding instructions should be strictly adhered to as prescribed in this manual and any applicable electrical safety requirements, all local electrical safety codes, and NEC. The charging station relies on the grounding system for safety. Verify with the local Authority Having Jurisdiction prior to starting construction. In most jurisdictions the installation of this equipment requires plan check, building and electrical permits. Local building codes need to be complied with. This equipment should be installed by a journeyman level electrician. Read the entire installation instructions before designing the installation and prior to installation. If there are any questions, please contact customer service. Shut off power at the electrical disconnect or at the breaker. Do not operate the charger if the charging cable is damaged or if here are exposed wires in the charging cord assembly.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |